Bio
Founded in Doha in 2009, re-branded as powergreen in 2016 to deliver cutting-edge renewable energy solutions with an active tender presence in MENA.
Power Green Group is a Qatar-based energy holding company developing, investing in, and managing strategic projects across the oil and gas, power, industrial, and renewable-energy sectors. The Group connects international technology providers, investors, contractors, and government stakeholders to develop commercially viable energy projects in Qatar and international markets.
Innovations Unlimited ME was founded in Doha in 2009. Within its walls a small green division began delivering solar water heating and photovoltaic work for local developers — at a time when very few contractors in Qatar treated renewable energy as a serious engineering discipline.
In 2016 that division became powergreen — a full-fledged business with its own brand, its own engineering bench and its own warehouse. The transition from division to company allowed us to explore new avenues to share our passion, and to bid on work at a scale a side-line could never carry.
Today our portfolio spans megawatt-scale rooftop plants at Msheireb Downtown, the first vertical BIPV façade in Qatar at Falcon Tower, robotic cleaning systems for Kahramaa and a thousand solar bus shelters for Mowasalat — with an active tender presence across the MENA region.
Both companies sit under Bin Tawar Holding. The group provides the balance sheet, the logistics reach and the multi-sector delivery record; powergreen provides the renewable engineering — which is why a rooftop in Msheireb and a reservoir for Kahramaa can be carried by the same team.
Parent group Bin Tawar Holding bintwarpartners.com Visit Bin Tawar PartnersThe company opens in Doha with an engineering and contracting mandate, and a small green division inside it.
Msheireb Downtown phases begin — on-grid PV and large-scale solar thermal water heating in the heart of Doha.
The Quality Management System is certified to ISO 9001 and the Occupational Health & Safety Policy is issued.
The green division is rebranded and spun up into a full renewable energy business with its own team and warehouse.
The Ali Bin Hamad Al Attiya Arena rooftop plant — 1,146 modules, 250 kWp — takes the award.
Solar PV, BIPV, solar thermal, solar lighting, wind and robotic O&M across Qatar and the wider region.
Founded in Doha in 2009, re-branded as powergreen in 2016 to deliver cutting-edge renewable energy solutions with an active tender presence in MENA.
To pursue excellence in service delivery through constantly innovating our solutions and skillsets.
To be the preferred gateway to renewable energy solutions across the region.
Over 40 renewable energy projects and 6MW+ of total installed capacity delivered.
A strong network of technology partners, deep in-house skill development and a relentless focus on quality of service.
Investing our time in the service of your success.
Feasibility, design, simulation, procurement, installation, commissioning and maintenance sit under one roof — no gap between the promise and the plant.
Modules, collectors and luminaires from manufacturers whose warranties run 12 to 25 years and whose factories we have audited.
Every system is simulated in PV*SOL or Polysun before installation and benchmarked against that prediction after commissioning.
800 m² of stocked spares and tools in Doha means a fault becomes a service visit, not a shutdown waiting on a shipment.
The world's second-largest LNG exporter, with all electricity produced domestically and zero imports. The largest blue ammonia plant in the world is due to start production in 2026, alongside the 800 MW Al Kharsaah solar plant already on the grid.
Ranked first globally for general infrastructure. USD 8.5 trillion of combined GDP sits within 3,000 km of Qatar, and more than 70 countries hold double-taxation agreements with it — which is what makes importing European plant and exporting energy output workable.
Six per cent average GDP growth over fifteen years, first in the GCC for economic resilience and for financial markets, and sovereign ratings of AA from S&P and Fitch and Aa2 from Moody's.
Fourth globally for FDI confidence in emerging markets and first globally for tax policy, with liberal foreign-ownership law and an efficient legal framework behind it.
Around 3,000 engineering graduates a year, more than 19 research centres and 32 higher-education institutions, third globally for openness to foreign talent, and a national target of 1.5% of GDP spent on R&D — the pool we staff project teams from.
Regional capital is moving with it: Middle East players spent about USD 5 billion on climate-tech transactions in the first three quarters of 2023 — nearly triple the USD 1.8 billion of 2022, of which USD 225 million came from Qatar. MENA solar capacity is expected to grow by roughly 180 GW by 2030, and Gulf national oil companies could capture USD 200 billion of green-hydrogen revenue by 2050. Source: Cleantech in Qatar, Invest Qatar, August 2024.
Modelling, simulation and system design for green projects — the stage where yield, payback and grid behaviour are decided.
Local industrial capacity and audited European manufacturing partners, with technology tested in the project environment before it is committed.
Logistics, warehousing and system integration — turning a specified technology into an installed, commissioned asset on a Qatari site.
Energy efficiency programmes, certification support and the maintenance that keeps a plant producing for the twenty years its warranty covers.
Context: average annual clean-energy investment in the Middle East is projected to rise from about USD 24 billion (2018–2021) to USD 202 billion (2022–2030) and USD 326 billion (2031–2050) — a 61% compound growth rate. The MENA region receives 22–26% of all solar energy reaching the earth. Source: Cleantech in Qatar, Invest Qatar, August 2024 (IEA, IRENA, World Bank).
Quality audits, mentoring and training
Quality control and documentation
Weekly project, management and document reviews
Monthly workplace inspections and incident investigation
Tell us about the site, the load and the timeline. We will come back with a feasibility view, a simulated yield and a clear route to commissioning.